Saturday, February 5, 2011

January Cancun Temperature Vs Punta Cana

spite house still much much mud

since the last days of the Installation is happening in the house much. Electricity and water is finished, complete walls and ceilings are verplankt. Is underfloor heating and floor layers were already there. It really is incredible how fast the workers of Danwood are. Almost two weeks was still nothing, and today is a house where so much is already done. Unfortunately, the pitch still can not let go. Our supervisor is one week after the assembly became ill, so we currently have not really have a local contact. That is not all that great, especially since we were really pleased with our construction manager. At this point: Get well soon Mr. Mrozek.
is also exposed to the current thaw our old problem again. The walls have started to become independent again and again it is pretty much mud slid in and as long as we have not laid waste water and drainage, we must always get out. So tomorrow we will have again a major operation.



Oh, and topping out we had.

0 comments:

Post a Comment